Charge for part of one. Type 1.5 in a line’s Quantity and the line is charged as one and a half. Lines you type whole numbers on work exactly as they always have.

Typing a Part

  1. On a job’s Equipment tab, choose the line
  2. In Quantity, type a number with up to two decimal places, such as 1.5 or 0.25
  3. The line is charged as what you typed: its rate, times the part, times its days

Days stay whole numbers. A day and a half of an engineer is a quantity of 1.5 on one engineer, and half a day of kit is a quantity of 0.5.

What Goes Out

Nobody sends half a desk. A line that holds stock holds the whole number above what you typed: 1.5 holds 2, and 0.5 holds 1. The line says so beside the quantity, for example 2 go out, and that is what availability counts, and what the warehouse holds, picks, scans and brings back.

A line that holds nothing, such as a labour product, simply shows the 1.5 you typed.

What Your Client Sees

  • The quote, the invoice and the approval page print the part you typed, 0.5, and charge for it
  • Your accounting package receives the same 0.5 whenever the line comes to whole pence; any other line goes across at its total, with “quantity 0.5” in its description, so the invoice matches to the penny
  • The crew’s paperwork, the pick list, the delivery note, the carnet and the labels, print the whole number that goes out

Good to Know

  • A part is typed in a job line’s Quantity. Counts elsewhere, such as the number of a product you pick or the items in a kit, stay whole
  • A line charged as a part is the office’s: somebody who cannot see money cannot change its quantity, and is asked to speak to the office
  • Spares still go on top, and are never charged
  • On the Mac, the iPhone and Android, part quantities arrive with the new apps
  • The Rental HQ API takes a part too. See the developer reference

Next Steps

Was this helpful?
Up next
What We Make
What each job brings in, what it costs and the margin, beside its price.