Jobs are the heart of Rental HQ. Every hire, dry hire, and event flows through a structured pipeline that keeps your whole team in sync: warehouse, office and crew.
The Pipeline
A job runs through eight stages, shown as a row of circles at the top of the job page. Stages behind you are ticked, the stage you are on is ringed, and Complete turns green when you reach it:
- Enquiry: Initial client request, no commitment yet
- Quoted: A quote has been sent to the client
- Confirmed: Client has accepted; equipment is reserved
- In Prep: Warehouse is pulling and testing equipment
- Dispatched: Equipment has left the warehouse
- Returned: Equipment is back at the warehouse
- De-Prep: Returned kit is being checked back in and put away
- Complete: Job is finished and closed out
Cancelled sits outside that line. Cancelling is offered up to the point the gear goes out, and it is reversible: a cancelled job shows a single red marker and a Reopen action that puts it back to Enquiry. Once equipment has been dispatched, process the return and archive the job instead.
A job that only sells kit completes when it is marked delivered. See Delivery, Collection and Proof.
A job’s equipment lines follow its stage. Confirm a job, however that happens (the button, the client approving the quote online, a deposit being paid, or the Mac or phone app), and its Provisional lines become Confirmed. A line added to a confirmed job arrives confirmed. Send the job back to Enquiry or Quoted, or cancel it, and its confirmed lines go back to provisional. Lines that have been picked, prepped, dispatched or returned keep the status scanning gave them.
Moving a Job Forward
Each stage has one named button in the job header, and it says what it does:
- Mark as Quoted: from Enquiry
- Confirm Job: from Quoted
- Begin Prep: from Confirmed
- Dispatch: from In Prep
- Mark Returned: from Dispatched
- Begin De-Prep: from Returned
- Mark Complete: from De-Prep
Going back is deliberately quieter. Open the overflow menu (the three dots next to Documents) and choose Back to {stage}, which steps the job one stage in the other direction. Cancelling lives in the same menu, so regret is never one mis-click away from the primary button.
Quoted means a quote went out. Before any quote has been sent from the job, Mark as Quoted opens Send Document instead: email the quote, or choose Send it yourself if it is going by WhatsApp or by hand. Either way the send is recorded and the job moves to Quoted. The server refuses the change without a recorded send, so it cannot be worked around from another device.
Status changes are limited to the owner, admin and manager roles. Other roles see the pipeline and the job, but not the buttons that move it.
Creating a Job
The list of jobs is the Opportunities page. Click Create Job there, or choose New Job from the + in the header (or press N and choose New Job) on any page, to open the form:
- Job Title: Required. A descriptive name (e.g. "Smith Wedding - Lighting Package")
- Client: Required, as in the apps. Search your contacts by company, person or email, or create one inline. People at the same company are listed together under its name, each with their own name and email, so you can see who you are choosing
- Venue: Search your venues, or reuse the client's own address in one click
- Type: Hire, Sale or Install
- Hire period: Required. The dates equipment is out of your warehouse. A Sale or Install asks for a single delivery date instead
- Event times: Optional. Start and end times for the event itself, and a Delivery and a Collection date and time, which go straight onto the job’s Timeline, where you can change them later
- Setup Days and Derig Days: Days on either side of the event for rigging and collection
- Notes: Client-facing job notes, which you can add now or later
Everything here can be changed afterwards from Edit details in the job's overflow menu.
Client reference: the client’s own purchase order number or budget code for the job, such as BR-DAV-AV-04, for a client whose finance team needs each quote and invoice to carry the budget line it belongs to. Click the Client card at the top of the job, or use Edit details, and type it in. It shows under the client’s name, prints as Your ref beside your own reference on the quote, the invoice, the hire agreement and a quote without prices such as a delivery note, shows on the client’s approval page, and goes with the invoice to Xero, QuickBooks or FreeAgent (see What Reaches the Books). It can still be added once a job is complete or invoiced, because a purchase order often arrives after the invoice; send the invoice again so your client has it. A copy of a job starts without one, as each quote usually belongs to a budget line of its own. Search for it on the Opportunities page or in the command palette, and add a Client ref column from the columns menu. On the Mac it is in the Client card and in Edit; on the iPhone it shows in Job Details and is changed in Edit.
Make a Job with AI, in the same + menu, takes a sentence such as “Make a job for Bristol Beacon, next Friday to Sunday: 8 SM58s and a digital console”. It shows the client, venue, dates and kit it understood, lets you correct them by replying, and builds the job when you are happy with it.
Hire period vs event times: The hire period determines when equipment is unavailable for other jobs. The event times describe the event itself. Setup and de-rig days widen the reservation on either side, so a job holds its kit from the setup days before the line starts until the de-rig days after it ends. Scan a line back in early and it frees its stock from the actual return date instead.
The Opportunities List
One row at the top holds Search, Filters and any labels you have chosen to filter by, so more of the list fits. Each client shows as a coloured pill with their whole name, and Created shows the full date. Each row shows its job type as a coloured stripe on its left edge; to tint the whole row, switch on Tint rows by job type under Settings, then Account. On a narrower screen, or with Larger text, the less important columns give way before the title is squeezed, and Columns says which ones have made room.
The Sections of a Job
A job page holds sixteen sections, arranged in four groups down the left on a wide screen, as wrapped pills on a tablet, and as a single picker on a phone. Counts appear beside Equipment, Services and Crew, so the rail doubles as a status readout.
- Build the job: Equipment, Services, Crew, Timeline
- Logistics: Loading, Check In/Out, Venue, Hotels, POs
- Compliance: RF IQ, H&S
- Comms & records: Messages, Sent, Files, Notes, Activity
Sent is the history of quotes and invoices you have issued, each with the priced snapshot the client received. It is hidden from roles that cannot see money, because the endpoints behind it are refused for those roles anyway.
Jump back in: the jobs you have been working on wait at the top of the Opportunities page, pinned ones first, and on the web and the Mac each opens on the section you left it on. Pin a job from its card to keep it at the front. The list is your own, and it is also the first thing in the command palette; on the Mac it is under File, then Open Recent, and in the Dock menu; on the iPhone it is on Today and in the menu you get by pressing and holding the app icon.
The Equipment Section
The Equipment section is where you build the quote by adding products to the job.
Adding Products
Click Add equipment, or press E, to open the picker. It shows your catalogue with live availability for the job's hire dates, in three parts:
- Kits: Saved bundles, listed first and coloured purple. The arrow beside a kit shows what is in it and how many of each are free. Tick any optional items you want, then add the kit. See Kits
- Blueprints: Saved lists of kit you put on jobs again and again. You see what is free for every line first, then it goes on as lines or as a group. See Blueprints
- Products: Your own stock, with columns for total stock, how much is already allocated, and how much is available. A product with accessories says how many, such as +4 acc. Click that, or the arrow beside the product, to see each accessory, how many go with each unit and how many are free. Always ones go on with the product every time. Included ones go on unless you untick them. Optional ones go on only when you tick them. Beside each is what it charges: its own rate, or no charge. Then add the product. See Accessories
- Partner stock: A section of its own, holding stock offered by partner companies. Each row names the partner and shows how many are free and their price to you after any partner discount. Sub-hire on a row adds it to your partner requests, which you send to the partner when you are ready. See Partner Hire
The availability badge on each row is a plain yes or no: green when any units are free for those dates, red when none are. Below it, a small amber "+N on quote" note counts units held by provisional lines on other jobs, which are not yet confirmed but could still take the stock.
For each line item you can set:
- Quantity: How many units you need
- Rate/day: Auto-populated from the product's default rate, but can be overridden per job
- Discount %: Per-line discount applied to that item
- Warehouse note: Internal notes for the warehouse team (e.g. "Use the newer units", "Pack with foam"). These appear on picking sheets but never on client-facing documents
Adding Straight Into a Group
On a job with groups, everything you add goes into a group you choose, at the end of it, or straight after the line you last clicked in it. A new line lights up for a moment so you can see where it went.
- A group’s own Add: Every group header has Add. It opens the picker titled Adding to: {group}, and everything you add from it, kits included, goes into that group. The group’s menu (the three dots) also has Paste a list, Add text line and Select its lines
- Adding to: The picker always says where it is adding. Click the name to choose another group by typing; a group inside another shows the group it sits in. Opened from the toolbar, it starts on the group of the line you last clicked, or the last group you added to on this job
- Add here: Every open group ends with an Add here row. Type a few letters, such as sm58, and the matches show with what is free for the job’s dates. Press Return to add the first one, type how many, and press Return again to come back for the next. Tab moves to the next group’s row, and Escape leaves
- Paste a list: Paste lines such as 4x SM58, 2 x DI box or XLR 10m ×6 into a group’s Paste a list, or straight into its Add here row. Each line is matched to your catalogue and shown with how sure the match is (Sure or Check) and what is free. Change a line, add it as a text line, or skip it, then add them all at once. What you confirm is remembered, so the same list matches itself next time
Lines that are not in a group sit at the foot of the list, under Ungrouped, and your quotes, invoices and hire contracts list them after the groups too, as the job page does. The warehouse can add into a group, by any of these, but moving lines between groups is for the office.
Adding a Product That’s Already in the Group
Your company chooses what one click does, in Settings, then Jobs (Availability on the Mac, under Adding equipment):
- Add to its line (the usual way): a second SM58 in the same group makes that line 2. In the picker, the product shows how many the group has with a stepper, and beside it Add as a new line adds one more as a line of its own
- Start a new line: every add is a line of its own, at the end of the group, so a group can be built in the order it is connected: 63/3 5m, 63/3 Distro, 63/3 5m, 63/3 Distro, 32/1 10m. In the picker, New line adds one, and the stepper beside it is labelled Last line: and changes only that line. Once the product has more than one line in the group, the whole of it shows beside the stepper, such as ×4 in 2 lines
Either way, the picker only counts and changes lines in the group it is adding to, never the same product in another group. Two lines of a product are held, picked and scanned exactly as one line of both would be: Smart Scan fills one line before it starts the next, and each line keeps its own discount. Quotes and invoices print repeated products as one line unless you choose otherwise (see Clean Quotes), and a group’s menu can combine its lines at any time.
Moving Several Lines at Once
Click a line to choose it, Shift-click another to choose everything between, or Command-click (Ctrl-click on Windows) to add or take away one line. Then choose Move to group from the bar at the foot of the screen, or press M, and type the group’s name. You can also drag the chosen lines together onto a group’s header. A kit always moves with everything in it. On the Mac, Move to Group is in the line’s menu and on Shift-Command-M.
Finding Your Way Round a Big Job
Press J (or Command-J, which is also the Mac’s key), or click Jump, and type part of a group’s name: Return opens that group and takes you to it. The same window has Expand all and Collapse all, and the More menu above the table has Expand everything and Collapse everything. Each job remembers which of its groups you left open.
When You Ask for More Than You Have
Type a quantity above what is available and an Insufficient Stock dialog appears rather than silently over-booking. It offers three ways out:
- Add {n} only: Reduce the quantity to what is actually free
- Add all {n} anyway: Take the shortage on. The line is flagged short until it is covered, which is what you want for kit you have on order or intend to sub-hire
- Add all {n} and sub-hire {m} from a supplier: One line for everything, and a hire-in purchase order for the rest. The line stays short until the kit is booked in. See Sub-hiring from a Supplier
Where none of your own stock is free, Add {n} only is not offered, because there is nothing to add. The sub-hire choice is shown only to roles that can see money.
Editing a Line
Click a line to select it, and the pane beside the table shows that line: its quantity, what is free for the job’s dates, Rate/day, Discount %, Line total (what the line earns after every discount), its status, the warehouse note and Hide from quote. On a narrower screen the pane opens as a sheet. Each field saves when you leave it, and Escape puts it back. Click an empty part of the page, or press Escape, to let go of the line.
Every line also has a menu: the ⋯ button at the end of the row, or a right-click on it. It holds Edit line…, Swap product…, Sub-hire from a supplier…, Hide from quote, Move to group and Remove from job, among others. See The Equipment Table for the whole table.
Once a line has been picked, prepped, dispatched or returned, its quantity is locked, and so is a kit’s once anything in it has been scanned, so the record of what went out stays true. Scanning, or scanning back, is how those lines change.
Job Price
On the Equipment and Services sections, a price bar along the bottom of the job page carries the figures the quote will print, services included, and updates as you add, remove or edit lines. While no line or group is selected, the pane beside the table is the Job price pane: the whole-job discount, the job’s deal prices and the deposit are edited there, and anything offered as an option is listed with its price. See Job Price for each figure, and Deals & Discounts for agreed prices.
The Timeline Section
The Timeline section breaks a job into phases: prep, load, delivery, setup, in use, take down, collection, unload and de-prep. Each phase has its own dates and times, and can have people assigned to it.
Every phase carries a £ On / £ Off toggle that decides whether it counts towards billing:
- Chargeable phases: Days the client is billed for (e.g. the event itself)
- Non-chargeable phases: Days equipment is out but not billed (e.g. setup, de-rig, travel)
Changing a chargeable period rescales any per-day service lines to match, and the app tells you how many it moved, because that changes what the client is charged.
Three things can decide how many days a job bills for, in this order. The job's own chargeable days value wins if it has one. Failing that, the chargeable phases on the Timeline are added up. Failing both, the length of the hire is used.
On imported jobs the Timeline may not move the billed days. The job-level chargeable days value is set by the import and is read-only in the portal, and it takes precedence over the phases. If a job was imported carrying that value, switching phases on and off will not change what is billed.
The H&S Section (RAMS)
Coming soon. The Health & Safety tab will provide RAMS (Risk Assessment Method Statements) assembled from a library of hazards and controls that a competent person has approved, matched to the equipment on the job and the venue it is going to.
It is not switched on yet, and the delay is deliberate. A risk assessment is relied on by people doing physical work, so every line on ours comes from an approved library entry rather than being written for the occasion, each one records why the job selected it, and a named person signs the document off before it can be issued. We would rather take the time to get that right than ship something that reads well.
PAT testing, inspections and maintenance are unaffected and work as described in the rest of these articles.
The Notes Section
The Notes section holds two kinds of note:
- Job notes: Visible on quotes and client-facing documents. Use these for special instructions, delivery details, or terms the client needs to see.
- Internal notes: Only visible to your team within Rental HQ. Use these for internal reminders, client quirks, or operational details.
The Files Section
The Files section keeps the documents and photos that belong to a job: stage plots, riders, contracts, site photos. Drop several onto it at once, or use Upload on the web and Add on the Mac. Files are carried over when the job is cloned.
Size. On the web and in the latest Mac app, pictures, video and audio can be up to 5 GB each, and documents, drawings, show files and zip files up to 1 GB. Files over 32 MB are added by owners, admins and managers. Each upload shows how far it has got, with pause, carry on and cancel, and one interrupted by a dropped connection carries on where it stopped. A file added this way is checked before anyone can open it, with a virus scan for documents, drawings and show files, and for pictures, video and audio up to 200 MB: it shows Checking until it is ready, and a file that fails the check says so and nobody can open it. Guest upload links take files up to 30 MB.
Who sees each file. A file is for Everyone, Office only or Managers only. An Office only or Managers only file wears a pill beside its name:
- Everyone: everybody who can open the job, crew included
- Office only: owners, admins and managers, and staff who are employees. Crew, the warehouse and read-only logins do not see it
- Managers only: owners, admins and managers
Choose as you add a file: owners, admins and managers pick from all three beside Upload, and staff who are employees can tick Office only. To change it later, open the file’s menu, where Share with crew opens it to everyone. Only owners, admins and managers can make a file Managers only, or change one that is. Mark each person Employee or Subcontractor in Team, or under Contacts, then Users: a subcontractor is crew, and sees everyone’s files only.
Guest upload links. To take files from an engineer or an events team who has no login, make a Guest upload link on the web, or Guest Link on the Mac, and send it to them. Anyone with the link can add files to this job without signing in, and each one is marked guest in the list. A link works for 14 days, and the date it ends shows beside it. It takes the files an events team sends: photos, PDFs and other documents, audio, video, show files, drawings and zip files, up to 30 MB each, and up to 50 files and 1 GB on a job in a day. Revoke a link at any time, and make a new one whenever you need it.
On the web, Spec IQ can read a rider or tech spec straight from the list: choose the sparkle beside the file.
Folders, and every file in one place. On the web and the Mac, a job’s files sit in six folders, from Show files to Paperwork, and every file your team may open is also in Files. Replace a file there and the one before is kept as an earlier version: see Replace and Earlier Versions.
Invoicing
Invoicing is a flag, not a pipeline stage. The Invoice button sits in the job header and can be used at any point after Enquiry, so the job keeps moving through prep, dispatch and returns while the office bills on its own schedule.
This is useful for situations like:
- Invoicing on confirmation, before equipment has even left the warehouse
- Invoicing while the job is still out
- Invoicing after completion as part of your normal billing cycle
Marking a job invoiced locks it. Equipment, dates and pricing become read-only, a banner says so, and re-pricing from the catalogue is refused, because the figures are now a record of what you charged. The button turns into Invoiced and clicking it again un-invoices the job, which unlocks everything. Completing a job locks it the same way.
Once a job is invoiced, a Push to accounting button appears beside it for sending the invoice to Xero, QuickBooks or FreeAgent. See Accounting Overview.
Documents
Everything the job can produce lives behind the Documents button in the job header:
- Send…: Opens Send Document. Email it sends the PDF from Rental HQ. Send it yourself records the send the same way and gives you the PDF and the approval link to pass on. Either way the priced snapshot is filed under Sent
- Quote: A client-facing quote with your branding, equipment list and pricing
- Invoice: A formal invoice with your company details, bank details and payment terms. It only appears once the job has been marked invoiced
- Pick List: The warehouse's list of what to pull. On a job that hires kit in, there is an Our kit pick list and a hired-in list, one for each supplier when there are several
- Hire Agreement: The contract that goes out with the kit
- Call Sheet: Who is where and when, available with the Team module
- Missing Items Report: While kit is still out or lost, preview it or send it to the client, and send a Missing Sub-hire Report to each supplier whose kit is missing. See Overdue & Missing Kit
- ATA Carnet: For kit going abroad, the general list, a label for every case and the chamber’s CSV, with a check for anything to put right. For owners, admins and managers. See ATA Carnets
Each one opens a preview first, with a Download button in the preview window, so you can check a document before it leaves the building. The preview of a quote, an invoice (or one of your own invoice versions) or a hire agreement also has Send…, which opens Send Document for the document you are looking at.
The priced documents are money-gated: Send…, Quote and Invoice are not offered to roles that cannot see money, and the server refuses them too. The pick list and hire agreement carry no figures, so they stay available to the warehouse.
Every document pulls its branding, address, VAT number, bank details and footer text from your Company Settings.
Delivery, Collection and Proof
The Delivery card sits at the top of a job’s Loading section once the job has gone out, and on a job that sells kit before then. It shows who the delivery is for (the Delivery contact), the job’s Owner, and each shipment with its carrier, service and tracking. Choosing the owner and the delivery contact is for the office.
Shipments
Add shipment records a consignment: the carrier and service, the tracking numbers and link, when it was sent and when it is expected, the parcels and the weight. Tick the box to email the delivery contact and they are told it is on its way, with the tracking link. The office and the warehouse add, change and take off shipments.
Mark Delivered
Once the job has gone out, Mark delivered records that the delivery arrived: the day and time, who took it (their name, as they printed it), any notes, and photos or a scanned delivery note as Proof of delivery. More proof can be added afterwards with Add proof.
Mark Collected
On a job that hires kit, once it has gone out, the Delivery card also offers Mark collected, for the kit coming back. It is the same form in its own words: the day and time it was Collected, who it was Handed back by (their name, as they printed it), any notes, and photos of the state it came back in as Proof of collection. A job has one collection. It records the kit coming back and the job’s status stays as it is: the return scans move the job, as they always have. Take this collection off undoes one recorded by mistake.
Signed on Screen, and the Client’s Copy
Mark delivered and Mark collected both have a Signature box, for a customer at the counter: they sign with the mouse, a pen or a finger, and Clear signature starts again. It is optional. Left blank, the form saves exactly what it always did.
With a signature, Rental HQ makes a signed copy as a PDF, with the signature, who signed and when, and the photos, in your company’s design. It is kept in the job’s files, named such as RHQ-2026-0324 proof of delivery.pdf and marked Made by Rental HQ. When you tick the box to email the delivery contact, the email waits for the signature and photos to upload, then goes with the signed copy attached. Until then the record says “The email goes with the signed copy once the proof is in.” The time it was signed shows under the record, such as Signed at 10:42.
- A job that only sells kit completes when it is marked delivered
- A job that also hires kit records the delivery and stays open for the hire
- A job with shipments is marked delivered one shipment at a time. The whole job cannot be marked delivered while a shipment is still on its way
The job’s owner is told. When the delivery contact has an email address, the form offers to email them that it has arrived, ticked to start with; untick it to send nothing. Take this delivery off undoes a delivery recorded by mistake, and the job’s status stays as it is.
Deliveries Due and Late
A shipment with an expected day shows on the Calendar on that day: a small van by the date in Month, in the day’s header in Week and Day, and a row of its own under Deliveries due on the Timeline. The van is blue while the delivery is due, red once it is late and green when it has been marked delivered. Click it to see the day’s deliveries and open a job’s Loading section, where Mark delivered is. The iPhone’s Schedule lists them under each day.
A delivery is late when it has not been marked delivered by the end of its expected day, on your company’s own clock, while the job is out (Dispatched, Returned or De-prep). The next morning the job’s owner is told once in their notifications, and on their phone unless it is night where your company is, with several late deliveries in one push. The Deliveries switch in their notification settings turns the push off. It stays under Late deliveries on their My work, on the web and the Mac, until it is marked delivered.
Who Can Do What
- Owners, admins, managers and employed staff do all of it, and choose the owner and the delivery contact
- The warehouse adds shipments and marks deliveries and collections
- Freelancers booked on the job can mark it delivered or collected, add their own proof and email the delivery contact that it has arrived. They see the job’s shipments and its delivery contact, and only the proof they added themselves. Adding or changing a shipment, choosing who the delivery goes to and taking a delivery or collection off stay with the office. A booking still at Not invited yet does not count
Next Steps
- Quotes & Invoices: Understand pricing, chargeable days, and PDF documents
- Company Settings: Configure the details that appear on your PDFs
- Managing Products: Set up your product catalogue and default pricing